Skip navigation
Home
Browse
Browse Items by:
Issue Date
Author
Title
Subject
Communities & Collections
Lang
русский
English
Log in:
My DSpace
Receive email
updates
Edit Profile
Репозиторий БГУИР
Browsing by Author Egorova, N. G.
Jump to:
0-9
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
А
Б
В
Г
Д
Е
Ж
З
И
Й
К
Л
М
Н
О
П
Р
С
Т
У
Ф
Х
Ц
Ч
Ш
Щ
Ъ
Ы
Ь
Э
Ю
Я
or enter first few letters:
Sort by:
title
issue date
submit date
In order:
Ascending
Descending
Results/Page
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
Authors/Record:
All
1
5
10
15
20
25
30
35
40
45
50
Showing results 1 to 20 of 21
next >
Issue Date
Title
Author(s)
2010
A stability approach for minimizing total weighted completion time with uncertain data
Egorova, N. G.
;
Sotskov, Y. N.
;
Werner, Frank
2021
Dynamic pricing with demand disaggregation for hotel revenue management
Bandalouski, A. M.
;
Egorova, N. G.
;
Kovalyov, M. Y.
;
Pesch, E.
;
Tarim, S. A.
2015
Experimentation with a dynamic pricing approach for hotel industry
Egorova, N. G.
;
Bandalouski, A. M.
;
Kovalyov, M. Y.
;
Pesch, E.
;
Tarim, S. A.
2010
Measures of problem uncertainty for total weighted flow time scheduling on a single machine
Egorova, N. G.
;
Sotskov, Y. N.
;
Werner, Frank
;
Tsung-Chyan Lai
2014
Minimizing total flow time under uncertainty using optimality and stability boxes
Egorova, N. G.
;
Sotskov, Y. N.
;
Werner, F.
2010
Minimizing total weighted completion time with uncertain data: a stability approach
Egorova, N. G.
;
Sotskov, Y. N.
;
Werner, Frank
2009
Minimizing total weighted flow time of a set of jobs with interval processing times
Egorova, N. G.
;
Sotskov, Y. N.
;
Lai, T.-C.
2015
Planning time-management as sequencing given jobs with interval processing times
Egorova, N. G.
;
Sotskov, Y. N.
;
Werner, F.
2009
Schedule execution for two-machine flow-shop with interval processing times
Egorova, N. G.
;
Matsveichuk, N. M.
;
Sotskov, Y. N.
;
Lai, T.-C.
2006
Sequence-dependent setup and removal times in a two-machine job-shop with minimizing the schedule length
Egorova, N. G.
;
Sotskov, Y. N.
;
Lai, T.-C.
;
Werner, Frank
2008
Sequence-dependent setup times in a two-machine job-shop with minimizing the schedule length
Egorova, N. G.
;
Sotskov, Y. N.
;
Lai, T.-C.
;
Werner, Frank
2007
Sequence-dependent setup times in a two-machine makespan job-shop scheduling problem
Egorova, N. G.
;
Sotskov, Y. N.
;
Werner, F.
2008
Sequencing jobs with uncertain processing times and minimizing the weighted total flow time
Egorova, N. G.
;
Sotskov, Y. N.
2018
Single machine scheduling problem with interval processing times and total completion time objective
Sotskov, Y. N.
;
Egorova, N. G.
2018
Single-machine scheduling with uncertain durations for optimizing service logistics with one truck
Sotskov, Y. N.
;
Egorova, N. G.
2014
Stability polyhedra of optimal permutation of jobs servicing
Egorova, N. G.
;
Sotskov, Y. N.
2017
The optimality box in uncertain data for minimizing the sum of the weighted completion times of the given jobs
Sotskov, Y. N.
;
Lai, T.-C.
;
Egorova, N. G.
;
Werner, F.
2019
The optimality region for a single-machine scheduling problem with bounded durations of the jobs and the total completion time оbjective
Sotskov, Y. N.
;
Egorova, N. G.
2011
The stability box for minimizing total flow time under uncertain data
Egorova, N. G.
;
Sotskov, Y. N.
;
Tsung-Chyan Lai
;
Werner, Frank
2011
The stability box in interval data for minimizing the sum of weighted completion times
Egorova, N. G.
;
Sotskov, Y. N.
;
Tsung-Chyan Lai
;
Werner, Frank