Skip navigation

Browsing by Author Lai, T.-C.

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
А Б В Г Д Е Ж З И Й К Л М Н О П Р С Т У Ф Х Ц Ч Ш Щ Ъ Ы Ь Э Ю Я
 
Showing results 1 to 5 of 5
Issue DateTitleAuthor(s)
2009Minimizing total weighted flow time of a set of jobs with interval processing timesEgorova, N. G.; Sotskov, Y. N.; Lai, T.-C.
2009Schedule execution for two-machine flow-shop with interval processing timesEgorova, N. G.; Matsveichuk, N. M.; Sotskov, Y. N.; Lai, T.-C.
2006Sequence-dependent setup and removal times in a two-machine job-shop with minimizing the schedule lengthEgorova, N. G.; Sotskov, Y. N.; Lai, T.-C.; Werner, Frank
2008Sequence-dependent setup times in a two-machine job-shop with minimizing the schedule lengthEgorova, N. G.; Sotskov, Y. N.; Lai, T.-C.; Werner, Frank
2017The optimality box in uncertain data for minimizing the sum of the weighted completion times of the given jobsSotskov, Y. N.; Lai, T.-C.; Egorova, N. G.; Werner, F.