2009 | Minimizing total weighted flow time of a set of jobs with interval processing times | Egorova, N. G.; Sotskov, Y. N.; Lai, T.-C. |
2009 | Schedule execution for two-machine flow-shop with interval processing times | Egorova, N. G.; Matsveichuk, N. M.; Sotskov, Y. N.; Lai, T.-C. |
2006 | Sequence-dependent setup and removal times in a two-machine job-shop with minimizing the schedule length | Egorova, N. G.; Sotskov, Y. N.; Lai, T.-C.; Werner, Frank |
2008 | Sequence-dependent setup times in a two-machine job-shop with minimizing the schedule length | Egorova, N. G.; Sotskov, Y. N.; Lai, T.-C.; Werner, Frank |
2017 | The optimality box in uncertain data for minimizing the sum of the weighted completion times of the given jobs | Sotskov, Y. N.; Lai, T.-C.; Egorova, N. G.; Werner, F. |