Skip navigation
Please use this identifier to cite or link to this item: https://libeldoc.bsuir.by/handle/123456789/10351
Full metadata record
DC FieldValueLanguage
dc.contributor.authorEgorova, N. G.-
dc.contributor.authorSotskov, Y. N.-
dc.contributor.authorWerner, F.-
dc.date.accessioned2016-11-25T11:36:19Z-
dc.date.accessioned2017-07-27T12:26:51Z-
dc.date.available2016-11-25T11:36:19Z-
dc.date.available2017-07-27T12:26:51Z-
dc.date.issued2015-
dc.identifier.citationEgorova, N. G. Planning time-management as sequencing given jobs with interval processing times / N. G. Egorova, Y. N. Sotskov, F. Werner // Fakultät für Mathematik, Otto-von-Guericke-Universität. - №10. - Magdeburg, 2015. – Pp. 13.ru_RU
dc.identifier.urihttps://libeldoc.bsuir.by/handle/123456789/10351-
dc.description.abstractAn automated system for planning and controlling working hours for a person (time-management) is considered. The main stage in planning of the working hours is the construction of an optimal schedule of the jobs given for an employee. We propose to use algorithms for an optimal processing of a set of jobs with uncertain (interval) processing times on a single machine. The optimality criterion under consideration is the minimization of the total weighted completion times of the given jobs. This criterion may be interpreted as a measure of the effectiveness of the employee to fulfill the given set of jobs. Due to the nature of the planning process of the jobs for a person, it is assumed that the time needed for processing any given job may be undetermined (unknown) until the completion time of the job. Therefore, in the construction of an optimal schedule in time-management, only an upper bound and a lower bound on the factual processing time are assumed to be known for each job to be processed by a person.ru_RU
dc.language.isoenru_RU
dc.publisherOtto-von-Guericke-Universitätru_RU
dc.subjectпубликации ученыхru_RU
dc.subjectтайм-менеджментru_RU
dc.subjectпостроение расписанийru_RU
dc.subjectнеопределенностьru_RU
dc.subjectвзвешенные моменты завершения обслуживания требованийru_RU
dc.subjecttime-managementru_RU
dc.subjectschedulingru_RU
dc.subjectuncertaintyru_RU
dc.subjecttotal weighted completion timesru_RU
dc.titlePlanning time-management as sequencing given jobs with interval processing timesru_RU
dc.typeArticleru_RU
Appears in Collections:Публикации в зарубежных изданиях

Files in This Item:
File Description SizeFormat 
091002.pdf356.63 kBAdobe PDFView/Open
Show simple item record Google Scholar

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.