dc.contributor.authorEgorova, N. G.-
dc.contributor.authorMatsveichuk, N. M.-
dc.contributor.authorSotskov, Y. N.-
dc.contributor.authorLai, T.-C.-
dc.date.accessioned2016-11-29T07:36:50Z-
dc.date.accessioned2017-07-27T12:26:49Z-
dc.date.available2016-11-29T07:36:50Z-
dc.date.available2017-07-27T12:26:49Z-
dc.date.issued2009-
dc.identifier.citationEgorova, N. G. Schedule execution for two-machine flow-shop with interval processing times / N. G. Egorova and others // Mathematical and Computer Modelling. – 2009. – Vol. 49. – № 5–6. – P. 991–1011.ru_RU
dc.identifier.urihttps://libeldoc.bsuir.by/handle/123456789/10420-
dc.description.abstractThis paper addresses the issue of how to best execute the schedule in a two-phase scheduling decision framework by considering a two-machine flow-shop scheduling problem in which each uncertain processing time of a job on a machine may take any value between a lower and upper bound. The scheduling objective is to minimize the makespan. There are two phases in the scheduling process: the off-line phase (the schedule planning phase) and the on-line phase (the schedule execution phase). The information of the lower and upper bound for each uncertain processing time is available at the beginning of the off-line phase while the local information on the realization (the actual value) of each uncertain processing time is available once the corresponding operation (of a job on a machine) is completed. In the off-line phase, a scheduler prepares a minimal set of dominant schedules, which is derived based on a set of sufficient conditions for schedule domination that we develop in this paper. This set of dominant schedules enables a scheduler to quickly make an on-line scheduling decision whenever additional local information on realization of an uncertain processing time is available. This set of dominant schedules can also optimally cover all feasible realizations of the uncertain processing times in the sense that for any feasible realizations of the uncertain processing times there exists at least one schedule in this dominant set which is optimal.ru_RU
dc.language.isoenru_RU
dc.publisherElsevierru_RU
dc.subjectпубликации ученыхru_RU
dc.subjectзадача планирования для поточной линииru_RU
dc.subjectоптимальное по быстродействию расписаниеru_RU
dc.subjectнеопределенностьru_RU
dc.subjectдоминированиеru_RU
dc.subjectflow-shopru_RU
dc.subjectmakespanru_RU
dc.subjectuncertaintyru_RU
dc.subjectdominant scheduleru_RU
dc.titleSchedule execution for two-machine flow-shop with interval processing timesru_RU
dc.typeArticleru_RU
Appears in Collections:Публикации в зарубежных изданиях

Files in This Item:
File Description SizeFormat 
041002.pdf932.84 kBAdobe PDFView/Open
Show simple item record Google Scholar

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.